[摘要]随着我国社会经济飞速发展和城市化进程的不断加快,工程建设取得了很多骄人的成绩。建筑项目当中的土木工程质量对于建筑业发展起着非常关键的作用,因此,土木工程的质量管理和控制成为人们关注的话题。本文主要论述了土木工程管理施工过程质量控制的必要性并提出土木工程管理施工实践中质量的控制措施,对于土木工程管理施工实践具有一定的参考价值。
[关键词]土木工程;质量控制;管理施工
Abstract:Along with China's rapid social and economic development and the accelerating process of city, construction has achieved many remarkable achievements. The quality of civil engineering construction projects for the development of the construction industry plays a key role, therefore, the quality management and control of civil engineering has become a topic of concern. This paper mainly discusses the necessity of quality control in the process of construction of civil engineering management and control measures are put forward in the practice of quality management of construction engineering, which has a certain reference value for the practice of construction management of civil engineering.
Key words :civil engineering construction management; quality control;
2095-2104(2013)1-0020-03
建筑业同人们的起居生活密切相关,其项目当中的土木工程方面尤为重要,土木工程的管理施工质量控制是整个建筑工程的质量控制重点,并且是保证施工项目整体质量的关键。建筑业的生存和发展要求建筑企业必须重视企业施工质量管,并掌握土木工程管理施工实践中的质量管控措施。
土木工程施工现场是露天工地,受地质、气候条件影响非常大,施工周期也会由于其他原因被拉长,各工种间交叉及穿插作业的情况比较普遍,各种工序的交接及中间产品等非常繁杂。若不对隐蔽工程及时进行检查,只依靠事后的观察和调整,无法进行有效判断,从而难以保证土木工程施工质量以上种种因素对工程质量都会造成直接或间接的影响。
工程项目竣工以后,无法像工业产品一样拆卸检查或者更换不合格的零部件。在终检时发现问题也无法“包换”,而只能做有限的加固、维修等,因此,终检局限性就要求质量的管理和控制要在施工的全过程进行。
随着市场竞争不断加剧,就会出现施工企业受利益驱使而采取偷工减料或者其他不正当竞争手段的情况。所以,土木工程施工过程的质量控制与监管非常必要。只有工程的质量得到保证的前提下,才可以考虑工程进度与成本。土木工程施工及管理的质量始终是施工过程中必须重视的目标。
减少不必要的经济损失。
预防控制的充分准备,将相关隐患最大可能地消灭于萌芽阶段。这不仅是质量管理初期要实现的目的,健全的质量管理体系也是最终实现工程质量的基础性要求。好的工程质量管理能够最大可能地预防工程质量缺陷,将质量问题可能引起的事故概率最大限度地降低。有时在校安工程建设中,会有主要管理人员未按投标备案的人员到位,这时需要求总包单位的部门领导兼管这类项目,参加工地的第一次例会,必要时可与建设单位沟通,以取得支持。初期的预控措施要求对施工图纸及细部构造充分审查,要求施工人员熟悉图纸,避免差错,而且对于施工工程中发现的关键工程质量要求与具体特点有充分的了解。在开工之前,要明确开工报告需每项落实的内容及各参建班组所负责任务的内容,加强质量控制。这样会对土木施工过程当中的常见问题和质量通病加以有效防止和控制。
[摘要]随着我国社会经济飞速发展和城市化进程的不断加快,工程建设取得了很多骄人的成绩。建筑项目当中的土木工程质量对于建筑业发展起着非常关键的作用,因此,土木工程的质量管理和控制成为人们关注的话题。本文主要论述了土木工程管理施工过程质量控制的必要性并提出土木工程管理施工实践中质量的控制措施,对于土木工程管理施工实践具有一定的参考价值。
[关键词]土木工程;质量控制;管理施工
Abstract:Along with China's rapid social and economic development and the accelerating process of city, construction has achieved many remarkable achievements. The quality of civil engineering construction projects for the development of the construction industry plays a key role, therefore, the quality management and control of civil engineering has become a topic of concern. This paper mainly discusses the necessity of quality control in the process of construction of civil engineering management and control measures are put forward in the practice of quality management of construction engineering, which has a certain reference value for the practice of construction management of civil engineering.
Key words :civil engineering construction management; quality control;
2095-2104(2013)1-0020-03
建筑业同人们的起居生活密切相关,其项目当中的土木工程方面尤为重要,土木工程的管理施工质量控制是整个建筑工程的质量控制重点,并且是保证施工项目整体质量的关键。建筑业的生存和发展要求建筑企业必须重视企业施工质量管,并掌握土木工程管理施工实践中的质量管控措施。
一、土木工程管理施工过程质量控制的必要性
土木工程不同于工厂生产,工厂生产有固定的厂房和车间,土木工程施工具有一次性和复杂性特点。建筑土木工程在施工中不可能拥有工业产品的生产中应用的成套的生产设备和比较稳定的生产环境,很多的偶然性因素都影响着土木工程的施工质量。土木工程施工现场是露天工地,受地质、气候条件影响非常大,施工周期也会由于其他原因被拉长,各工种间交叉及穿插作业的情况比较普遍,各种工序的交接及中间产品等非常繁杂。若不对隐蔽工程及时进行检查,只依靠事后的观察和调整,无法进行有效判断,从而难以保证土木工程施工质量以上种种因素对工程质量都会造成直接或间接的影响。
工程项目竣工以后,无法像工业产品一样拆卸检查或者更换不合格的零部件。在终检时发现问题也无法“包换”,而只能做有限的加固、维修等,因此,终检局限性就要求质量的管理和控制要在施工的全过程进行。
随着市场竞争不断加剧,就会出现施工企业受利益驱使而采取偷工减料或者其他不正当竞争手段的情况。所以,土木工程施工过程的质量控制与监管非常必要。只有工程的质量得到保证的前提下,才可以考虑工程进度与成本。土木工程施工及管理的质量始终是施工过程中必须重视的目标。
二、土木工程管理施工过程质量控制措施
土木工程的施工质量控制,应遵循预防为主、防治结合的原则。在其具体施工过程当中,各施工阶段皆应对施工人员、施工材料及机械设备等因素严格控制,及时发现并妥善解决问题,最好土木施工前期就能够有效避免问题发生,论文导读:、质量检查、技术管理等能力;而生产人员应当具有精炼的艺术技能和认真、负责的工作态度;服务人员则应当提供有效的技术服务和完善的生活服务,以良好的服务质量间接保证土木工程质量。当然,管理人员要明白定位是管理其实是服务,现在工人一般不住工地,我在保障房建设管理中,就要求项目部准备夏季的凉茶冬天的热水给工人等等。减少不必要的经济损失。
1.完善质量管理体系
施工企业应当在土木工程开工以前就建立并完善企业质量管理体系,做好摘自:学士论文www.7ctime.com预防控制的充分准备,将相关隐患最大可能地消灭于萌芽阶段。这不仅是质量管理初期要实现的目的,健全的质量管理体系也是最终实现工程质量的基础性要求。好的工程质量管理能够最大可能地预防工程质量缺陷,将质量问题可能引起的事故概率最大限度地降低。有时在校安工程建设中,会有主要管理人员未按投标备案的人员到位,这时需要求总包单位的部门领导兼管这类项目,参加工地的第一次例会,必要时可与建设单位沟通,以取得支持。初期的预控措施要求对施工图纸及细部构造充分审查,要求施工人员熟悉图纸,避免差错,而且对于施工工程中发现的关键工程质量要求与具体特点有充分的了解。在开工之前,要明确开工报告需每项落实的内容及各参建班组所负责任务的内容,加强质量控制。这样会对土木施工过程当中的常见问题和质量通病加以有效防止和控制。