浅析建筑工程给排水施工技术-普通
最后更新时间:2024-09-13
作者:用户投稿本站原创
点赞:17188
浏览:73546
论文导读:
摘要:随着我国社会经济的不断发展,建筑工程的施工工艺也在不断的提高和改进。目前的建筑工程给排水施工和土建施工缺乏必要的配合,大量的预留预埋洞口设计不准确,严重影响了建筑工程给排水工程的使用功能和施工质量,降低了建筑工程结构的承载力。给排水工程施工质量的好坏会直接影响建筑工程给排水系统的正常。本文主要对建筑工程给排水管道的施工方法、安装施工技术和要点以及给排水施工质量控制进行了分析。
关键词:建筑工程;给排水;预留预埋;PP-R管;UPVC管;施工要点
Abstract: As China's economic and social development, building construction process is also in constant increase and improve. The current construction engineering water supply and drainage construction and civil construction lack of necessary coordination, a large number of reserve embedded the hole design is not accurate, serious impact on the architectural engineering water supply and drainage engineering use function and construction quality, reduce the building engineering structure bearing capacity. Water supply and drainage engineering construction quality is good or bad will directly influence the construction engineering water supply and drainage system of normal. This paper focuses on the architectural engineering water supply and drainage pipeline construction method, installation construction technology and the key points and water supply and drainage construction quality control are analyzed.
Keywords: Building engineering; Water supply and drainage, Reserve embedded; Pp-r pipe; UPVC pipe; Construction points
于施工组织管理。高层建筑给排水分区安装施工有两个原则:(1)按建筑层数分为上、下两个区域或者上、中、下三个区域;(2)按工程安装量的密集程度进行分区,像浴室、公共卫生间等用水量大并且管道密集程度高的施工要单独分区。对建筑工程给排水进行分区安装施工,能够系统、科学的组织施工,有效的监督和控制工程的施工质量。
在进行连接时要径直的把管道插入道加热套管中,并要达到预定的深度,同时也要径直的把管件推到加热头上进行加热,再充分达到加热时间之后,立即把管件和管道同时从加热头和加热套管上取下,并迅速的、径直的用力插入到所规定的深度。对于在规定加热时间内熔接好的接头还要进行合理的校正,并且严禁旋转。管道和管件连接完毕后,要紧握管件和管道确保它们有足够的冷却时间,让管件与管道连接牢固。在对管件和管道进行加热时,要防止过度加热,让管件的厚度变薄。
摘要:随着我国社会经济的不断发展,建筑工程的施工工艺也在不断的提高和改进。目前的建筑工程给排水施工和土建施工缺乏必要的配合,大量的预留预埋洞口设计不准确,严重影响了建筑工程给排水工程的使用功能和施工质量,降低了建筑工程结构的承载力。给排水工程施工质量的好坏会直接影响建筑工程给排水系统的正常。本文主要对建筑工程给排水管道的施工方法、安装施工技术和要点以及给排水施工质量控制进行了分析。
关键词:建筑工程;给排水;预留预埋;PP-R管;UPVC管;施工要点
Abstract: As China's economic and social development, building construction process is also in constant increase and improve. The current construction engineering water supply and drainage construction and civil construction lack of necessary coordination, a large number of reserve embedded the hole design is not accurate, serious impact on the architectural engineering water supply and drainage engineering use function and construction quality, reduce the building engineering structure bearing capacity. Water supply and drainage engineering construction quality is good or bad will directly influence the construction engineering water supply and drainage system of normal. This paper focuses on the architectural engineering water supply and drainage pipeline construction method, installation construction technology and the key points and water supply and drainage construction quality control are analyzed.
Keywords: Building engineering; Water supply and drainage, Reserve embedded; Pp-r pipe; UPVC pipe; Construction points
1. 建筑工程给排水施工方法
1.1 预留预埋
在建筑工程给排水施工中,孔洞、套管的预留预埋、管井的准确是确保工程施工质量的关键所在。加强预留预埋工作,做到事前控制不但可以有效避免破坏建筑工程的结构,还可以减少预埋套管的绕渗和偏移、事后凿孔。在施工中,技术人员必须要充分了解施工图纸的意图,熟悉安装工艺、管道配件安装的尺寸大小、洁具和设备的安装尺寸,对工程的重点部位,比如标准首层,对比建筑结构尺寸绘制出给排水预埋图,做出专项施工组织设计,形成建筑工程各楼层的预留预埋统计表,并要对照统计表的数量和位置检查各楼层预留预埋情况。并要在保证预留预埋位置及数量准确的情况下,对预留套管和预留孔周边进行振捣,从而防止预留套管周围因出现孔洞而造成绕渗。同时在进行混凝土浇筑时,还要纠正预留套管和预留孔的偏移。1.2 分区安装施工
目前的建筑工程大多属于高层建筑,而高层建筑具有施工组织管理难度大、垂直高度较高、施工面积较大等特点。因此,在建筑工程给排水施工时一般采取分区安装的施工方法。分区安装施工能够有效利用高层建筑的垂直空间,从而减少工程的施工工期,便摘自:硕士论文答辩技巧www.7ctime.com于施工组织管理。高层建筑给排水分区安装施工有两个原则:(1)按建筑层数分为上、下两个区域或者上、中、下三个区域;(2)按工程安装量的密集程度进行分区,像浴室、公共卫生间等用水量大并且管道密集程度高的施工要单独分区。对建筑工程给排水进行分区安装施工,能够系统、科学的组织施工,有效的监督和控制工程的施工质量。
1.3 样板层
在施工中,做样板层能够确认标准楼层每层管道的安装尺寸、位置、形式。一般建筑工程的层数较多,并且标准层都基本相同,所以可以选择其中的一层来作为样板层。在建筑工程给排水施工设计中往往会忽视管线交叉等问题,从而造成施工困难。所以,在施工前要认真理解设计图纸,并及时和设计部门进行沟通,对于设计不合理的地方要及时协商解决,保证安装数据的准确性。在进行样板层施工时,要着重控制管线平面的标高和布设位置,并根据设计选择合理的洁具和管道配件。在样板层管道安装完成后,要及时组织监理单位、设计单位、建设单位以及其他相关单位对样板层进行验收。然后,其他楼层的安装要按照样板层的数据进行施工,做到有据可依。2. 建筑工程给排水管道安装施工技术及要点
在目前建筑工程施工中给水管材的选择大多采用PP-R管材,而排水管的选择大多采用UPVC管材。PP-R管材和UPVC管材与传统的金属管材相比,这两种管材的优势显得更加突出,比如:管材的自重轻、使用寿命长、安装方便、耐压强度高、卫生安全、水流阻力小、耐腐蚀等。2.1 给水管道安装施工
PP-R管材的连接:在施工过程中PP-R管材有两种连接方式,即螺纹连接和热融链接。这两种连接方式中最安全可靠的事热融连接,在对PP-R管材进行连接前必须要清除干净管道及其附件上的异物和灰尘,论文导读:加热时间之后,立即把管件和管道同时从加热头和加热套管上取下,并迅速的、径直的用力插入到所规定的深度。对于在规定加热时间内熔接好的接头还要进行合理的校正,并且严禁旋转。管道和管件连接完毕后,要紧握管件和管道确保它们有足够的冷却时间,让管件与管道连接牢固。在对管件和管道进行加热时,要防止过度加热,让管件的厚度变在进行连接时要径直的把管道插入道加热套管中,并要达到预定的深度,同时也要径直的把管件推到加热头上进行加热,再充分达到加热时间之后,立即把管件和管道同时从加热头和加热套管上取下,并迅速的、径直的用力插入到所规定的深度。对于在规定加热时间内熔接好的接头还要进行合理的校正,并且严禁旋转。管道和管件连接完毕后,要紧握管件和管道确保它们有足够的冷却时间,让管件与管道连接牢固。在对管件和管道进行加热时,要防止过度加热,让管件的厚度变薄。